PV Power Plant Solution-4 The 500MWh site in California, USA, features 300 x 10-foot battery storage containers (BESS) and 150 x 20-foot 1725kWh boost converter-integrated storage units (ATEPS). This project will enhance existing on-site renewable energy generation by integrating photovoltaic power with energy storage. It offers several significant benefits: Optimizes new energy utilization Improves grid stability Participates in the spot market and auxiliary services Achieves economic benefits through market arbitrage The project effectively explores new energy applications in the spot market, smooths out renewable energy fluctuations, and addresses issues related to wind and solar energy curtailment.

Project Overview Available Only Through Renon Power

Core component selection instructions Resilient, adaptable, and efficient

System Layout Engineered by Renon Power

Core Parameters

Battery Storage System
  Cell Type System Battery Configuration Rated Battery Capacity(MWh) Battery Voltage Range(V) BMS Communication Interface BMS Communication Protocol  
 

3.2V/314Ah

416S1P*4*300 1.67*300 1040~1518 RS485,Ethernet Modbus TCP  
               
AC Output
Rated Power(kWh) Current Distortion Rate DC Component Grid Voltage(KV) Power Factor Power factor Adjustable Range Rated Frid Frequency(Hz) Grid Frequency Range(Hz)
1725*250 < 3 % (at rated power) < 0.5 % (at rated power) 35 > 0.99 (at rated power) 1 (overrun) to 1 (lag) 60 55~65

 

Learn More +

Technical Characteristics

Technical Characteristics

System Advantages

System Advantages

System installation and deployment

Earnings Calculation